?
?
主營業務
1.編制建設項目可行性研究報告中投資估算部分。
2.編制、審核設計概算。
3.為業主提供建設項目前期所需各種費用的咨詢服務。
4.為業主編制工程量清單及控制價。
5.為建設單位及施工單位進行招投標代理;編制、審核標底。
6.編制、審核工程預、結算;提供工程預、結算審核報告。
7.根據工程形象進度,提供工程付款審核報告。
8.提供工程索賠處理報告。
9.工程項目管理。
10. 為業主提供招標代理服務。
11. 為業主建立BIM模型,利用BIM技術為建設項目做全方位的造價控制。
12. 為業主提供工程建設全過程造價咨詢服務。

全過程造價服務具體服務內容:
1.編制整個項目的建安造價估算;
2.協助業主編制項目目標成本;
3.針對各專業分包工程的設計方案從投資控制的角度提出專業意見,以達到限額設計的目標;
4.編制施工圖預算或工程量清單,標底;
5.根據施工承包合同價、進度計劃,編制承包合同的工程資金計劃;
6.參加與造價控制有關的工程會議;     
7.負責對施工單位上報的每月(期)完成工作量月報表進行審核,并提供當月(期)付款建議書;
8.承發包雙方提出索賠時,提供專業咨詢意見;  
9.協助甲方及時審核因設計變更、現場簽證等發生的費用,相應調整造價控制目標;并向甲方提供
  造價控制動態分析報告;
10.核定分階段完工的分部工程結算;
11.審核工程竣工結算,提供整套結算報告及各項費用分析。



1. To prepare the investment estimation parts in a feasibility report of construction projects;
2. To prepare and to review design estimation of project;
3. To provide consulting services of all possible expense needed in earlier stage of construction project;
4. To prepare a bill of quantity (BOQ) and control prices of project, for project owner;
5. To conduct bid and tender on behalf of the owner and construction unit (contractor); to prepare and to review the base price of the tender.
6. To prepare and to review construction budget and settlement; and to provide the corresponding audit reports;
7. To provide the project payment audit report according to the visual progress of the project;
8. To provide engineering claims processing reports;
9. To implement project management;
10. To provide the owner with tendering agent service;

11. Establishing BIM model for owners,  Making full cost control for construction projects with BIM Technology.

12. To provide the owner with cost consulting service during the whole process of the project construction.

Specific cost-consulting services during the whole process:
1. To prepare the construction and installation cost estimates of the whole project;
2. To assist the owner with the preparation of target cost of the project;
3. To propose professional advice from the point of view of investment control according to the designing schemes of all professional sub-contracted works, so as to achieve the goal of the quota design;
4. To prepare the working drawing estimate or BOQ (bill of quantity), and base price of the tender;
5. To prepare the construction work capital plan of the work contract according to the contraction contract price and schedule;
6. To participate in all meetings of the cost control of project;
7. To be responsible for reviewing the monthly (periodical) workload statement of the construction unit and to provide the payment proposal of that current month (period);
8. To provide professional consulting advice when the contractor and outsourcer make a claim;
9. To assist Party A with auditing expenses incurred due to design changes, scene visa, etc., adjust the cost control objective accordingly and provide Party A with cost control dynamic analysis report.
10. To check and approve part settlement for projects completed in stages;
11. To review the final account for completed projects and to provide a complete document of final report and analysis of all expenses.
  

蜜芽亚洲av无码精品色午夜_亚洲∧V久久久无码精品_日本大香伊一区二区三区_国产精品一区在线观看你懂的